Daily Reports, Change Orders, RFIs and Logs

Construction Contractor Documentation

Construction contractor documentation is the written record of how a project was run: daily reports, meeting minutes, RFIs, submittal logs, change orders, inspection records and photographs. Paul Gaston reviews these records to reconstruct what the contractor knew and did, and to identify where records that would normally exist are missing.

A construction worker in a white hard hat reading plans in front of a concrete building frame

Records Paul Reviews

RecordWhat it can show
Daily reportsManpower, trades on site, work performed, problems, weather, visitors
Meeting minutesIssues raised, decisions made, responsibilities assigned
RFI log and responsesQuestions about the documents and how they were resolved
Submittal logWhat was submitted, approved, rejected or resubmitted
Change orders and directivesChanges to scope, price and time
Inspection and test recordsWhat was checked, by whom and with what result
PhotographsConditions before concealment and during construction
CorrespondenceNotices, disputes and acknowledgments

Reading Records in Context

Records are written by people under time pressure, and they vary in quality. Paul reads them in date order and in context, comparing daily reports with photographs and minutes to see whether they are consistent. A daily report that records drywall being hung in an area the photographs show was still open, for example, raises a question that needs to be addressed. He relies on records for what they show and notes where they conflict.

What Missing Records Can Mean

Gaps in documentation can be significant. If a contract required daily reports and none exist for a key period, or inspection records are missing for the area in dispute, that absence may bear on whether the contractor performed its obligations. It may also simply mean records were not produced. Paul identifies records that would normally exist on a project of that type, so counsel can determine whether they exist and were withheld, were lost, or were never created.

A construction worker in a hard hat and orange vest holding a set of plans on a jobsite at dusk

Documentation and Changes

Many contractor disputes are really documentation disputes about changes. Work proceeded on a verbal direction, a change order was never signed, or a field change was made without an RFI. Paul traces each disputed change through the record, identifies what documentation exists, and describes whether the handling of the change was consistent with the contract's procedures and recognized practice.

A Document Review Guide for Counsel

Early in an engagement Paul can provide counsel with a list of the records he would expect to see on the project, organized by type and period, along with suggested topics for depositions of project managers, superintendents and foremen. His observations support counsel's discovery decisions, which remain counsel's. See construction management practices and quality control responsibilities.

Photographs as Records

Construction photographs are often the best evidence of concealed work. Paul reviews them with their dates and locations where available, and notes where a photograph cannot be tied to a date or place, so that it is relied on only for what it actually shows.

Questions

Common Questions

Why are daily reports important?

They record who was on site, what work was performed and what problems arose each day, often providing the best contemporaneous evidence of how the project was run.

What if the contractor's records are incomplete?

Paul identifies records that would normally exist so that counsel can determine whether they were withheld, lost or never created.

Can records contradict each other?

Yes. Paul compares daily reports, photographs and minutes and notes inconsistencies that need to be addressed.

Can Paul help plan contractor depositions?

He can suggest topics based on the records and gaps he identifies. Strategy decisions remain with counsel.

Is the dispute about how the contractor ran the job?

Send the party names for a conflict check. Paul will review the contracts, records and conduct at issue and tell you what the evidence shows.